Door frame installation

1.Door frame joint should be tight and smooth, no black seam, lock accessories should be fixed.
2.Diagonal to be accurate, if the height of the door is 2m below, its error should be less than 1mm, if it is more than 2m, the error is less than 1.5mm.
3.Door frame installed, should be horizontal and vertical, verticality tolerance of 2mm, the level of flatness tolerance 1mm.
4.Between the door frame and the wall should be fixed with screws (not less than 3 per meter), door frame width should be above 20cm with fixed iron.
5.Between the door frame and the wall cracks with double sealed foam, foam should be evenly, dry cutting flat.

Line installation

1.Line should be installed with uniform coating door, wall fixed line, set the interface should be smooth, tight, seamless
2.There is a gap between the line and the wall, should use sealant caulking treatment.
3.After installation, the same side of the line should be in the same level, because if the wall is not normal, must ensure that the line interface level is smooth.
4.Installation of line camber tolerance within 1mm.

Door leaf installation

1.The door leaf is installed, should be flat, vertical, door and door exposed plane.
2.The door leaf open and shut without ring, seal tightly, do not swing, freely switch
3.The gap between the door frame and the door leaf, the seam under 6mm, the other three sides of 2mm, all the gap tolerance 0.5mm.

Hardware

1.The door hinge should be vertical and flat hinge screws should be installed, straight, hidden in the plane.
2.Flat hinge for doors leaf and door frame corresponding slot, slot size should be standardized and the same to the door, three edge tolerance hinge 0.5mm, assembly after the formation of seamless,

hinge opening should be flexible. Trigeminal hinge installation according to mold, the bolt should be inserted in place.
3.Door lock installation should be tightened, the lock is no different ring, the slot should be accurate and standard, size and the lock body, the lock piece is consistent.
4.Fittings installation is complete, fixed screw should be installed all, straight.
5.Door closer, handle and so on should be installed in the specified location, the installation is firm, the fixed screw should be installed all, straight, with good effect after loading parts.

Appearance

1.Door frame, door line and ground combined gap should be less than 3mm, and waterproof sealant sealing gap.